Industrial sourcing and implementation for Afghanistan

Fruit-Stone Activated-Carbon Production Line

A medium industrial plant converting qualified apricot, peach or other hard fruit stones into granular activated carbon through feedstock washing and drying, controlled crushing and sizing, oxygen-limited carbonization, sealed cooling, steam activation at high temperature, secondary combustion and flue-gas cleaning, product cooling, crushing/classification, washing only when specified, drying, adsorption testing and sealed packing. The project requires environmental approval and laboratory development before equipment purchase.

View detailed proposal PDF
Fruit-Stone Activated-Carbon Production Line equipment and production reference

Production line and factory setup overview

A medium industrial plant converting qualified apricot, peach or other hard fruit stones into granular activated carbon through feedstock washing and drying, controlled crushing and sizing, oxygen-limited carbonization, sealed cooling, steam activation at high temperature, secondary combustion and flue-gas cleaning, product cooling, crushing/classification, washing only when specified, drying, adsorption testing and sealed packing. The project requires environmental approval and laboratory development before equipment purchase.

Recommended lowest-entry line configuration Do not begin with a turnkey kiln order. First run representative Afghan apricot/walnut-shell or fruit-stone trials in an independent carbon laboratory and select one feedstock and one granular adsorption grade. The lowest credible plant needs separate sealed carbonization and steam-activation control, hot-product cooling, gas afterburner, dust collection/scrubbing, water treatment where washing is used, and iodine-number, moisture, ash, hardness and particle-size testing.

1 feedstockvalidated source
1 gradelaunch product
650-950°Cthermal stages
24-40entry workforce

Production process and implementation sequence

  1. Laboratory feedstock and adsorption trials
  2. Stone washing, drying and sizing
  3. Oxygen-limited carbonization
  4. Sealed char cooling
  5. Controlled steam activation
  6. Afterburning and flue-gas treatment
  7. Product sizing/washing/drying as specified
  8. Adsorption testing and sealed packing

Products, capacity and market fit

  • Afghanistan has concentrated fruit-processing residues with potential carbon yield.
  • Activated carbon has water-treatment and industrial demand but is specification-driven.
  • Feedstock species and carbonization history strongly affect adsorption performance.
  • High-temperature gas, dust and wastewater controls make this a regulated industrial project.
  • Granular fruit-stone activated carbon - Feedstock, mesh range, iodine number or target adsorption, moisture, ash, hardness, pH and density - Water treatment or one validated industrial adsorption application

Core production machinery and line specifications

Machine / stageFunction / valueProduction note
Wash, dryer, crusher and screenPrepares one fruit-stone feed1-3 cm kiln feed basis
Sealed carbonization kiln and char coolerProduces controlled precursor charOxygen-limited
Steam activation kiln and steam systemDevelops adsorption porosity850-950°C controlled
Afterburner and flue-gas treatmentControls combustible gas and emissionsPermit basis
Product crusher, classifier and optional wash/dryerFinishes one granular gradeClosed dust handling
Activated-carbon laboratoryReleases adsorption productIodine/adsorption, ash, hardness

Raw materials, utilities and factory requirements

Indicative low-entry investment and implementation plan

These planning ranges prioritize economical machinery, local labor and local civil works. Final pricing follows confirmed capacity, product specification, delivery terms and site conditions.

ScopeIndicative rangeEntry-plan note
Feed preparation and carbonization sectionUS$180k-420kOne validated feed
Activation, steam and hot-product coolingUS$220k-520kOne granular grade
Gas treatment, dust/water controls and laboratoryUS$160k-430kPermit and release basis
Freight, refractory, installation and sparesUS$140k-330kThermal commissioning
Indicative installed project totalUS$700k-1.70mLand, building, utilities extension and working stock excluded

Detailed proposal and next step

The proposal contains the complete line flow, machinery scope, raw-material and utility requirements, implementation stages and indicative entry planning. Final configuration follows confirmed products, capacity, site and budget.