Industrial sourcing and implementation for Afghanistan

Suspended-Ceiling T-Grid Systems Line

Produces galvanised-steel suspended-ceiling T-grid main runners, cross tees and perimeter angles by slitting, roll forming, punching, cut-to-length, end detailing, coating control and bundled packing.

View detailed proposal PDF
Suspended-Ceiling T-Grid Systems Line equipment and production reference

Production line and factory setup overview

Produces galvanised-steel suspended-ceiling T-grid main runners, cross tees and perimeter angles by slitting, roll forming, punching, cut-to-length, end detailing, coating control and bundled packing.

Recommended lowest-entry line configuration Start with the specified profile family and compatible ceiling-tile system. Confirm strip thickness/coating, load/span tables, punching geometry, clip compatibility, corrosion environment and installer demand before selecting a full roll-forming line.

approved samplemarket gate
defined rangelaunch scope
performance testrelease gate
batch recordstraceability

Production process and implementation sequence

  1. Coil receipt/slitting
  2. Roll forming
  3. Punching/slotting
  4. Cut-to-length/end detailing
  5. Straightness/profile check
  6. Bundling/labelling
  7. Tile-system fit release

Products, capacity and market fit

  • Approve a physical sample and applicable standard.
  • Launch with a defined product range and documented tool settings.
  • Keep material and quality records for each batch.
  • Suspended-ceiling T-grid systems - Steel grade/coating, tee profile, length, web/bulb geometry, cross-tee connection, load/span, corrosion class and tile compatibility - Offices, retail, schools, clinics, hotels, housing and fit-out contractors

Core production machinery and line specifications

Machine / stageFunction / valueProduction note
Coil decoiler/feederFeeds coated stripStrip/coating traceability
Roll-forming millForms tee profilesProfile/straightness tolerance
Punch/end-forming pressCreates connectorsClip/slot fit
Cut/bundle lineDelivers site lengthsLength/pack count
Load/fit QC fixtureChecks system compatibilitySpan/connection release

Raw materials, utilities and factory requirements

Indicative low-entry investment and implementation plan

These planning ranges prioritize economical machinery, local labor and local civil works. Final pricing follows confirmed capacity, product specification, delivery terms and site conditions.

ScopeIndicative rangeEntry-plan note
Slitting, roll-forming and punchingUS$35k-140kOne profile family
Cutting, bundling and QC fixturesUS$12k-55kSystem-fit controls
Freight, setup and trial coilsUS$15k-55kProfile trials required
Indicative entry totalUS$62k-250kWorkshop and coil stock excluded