Industrial sourcing and implementation for Afghanistan

Mineral-Fibre Ceiling Tiles Line

Forms mineral-fibre ceiling tiles from selected mineral fibre/fillers and binder through wet forming, pressing, drying/curing, surface coating, edge finishing, inspection and packing.

View detailed proposal PDF
Mineral-Fibre Ceiling Tiles Line equipment and production reference

Production line and factory setup overview

Forms mineral-fibre ceiling tiles from selected mineral fibre/fillers and binder through wet forming, pressing, drying/curing, surface coating, edge finishing, inspection and packing.

Recommended lowest-entry line configuration Treat as a medium industrial line: validate formulation, dust/waste controls, dimensional stability, moisture performance, fire classification and ceiling-grid compatibility before investment.

approved samplemarket gate
defined rangelaunch scope
quality testrelease gate
batch recordstraceability

Production process and implementation sequence

  1. Fibre/filler preparation and batching
  2. Wet forming and dewatering
  3. Pressing and controlled drying
  4. Surface coat/texture application
  5. Edge finishing and cutting
  6. Dimensional/fire/visual inspection

Products, capacity and market fit

  • Approve a physical sample and installation system.
  • Start with a focused, saleable range.
  • Document material and quality checks for every batch.
  • Mineral-fibre ceiling tiles - Tile dimensions, density, sag/moisture resistance, surface finish, edge detail, fire classification and grid fit - Offices, schools, hospitals, commercial interiors and ceiling contractors

Core production machinery and line specifications

Machine / stageFunction / valueProduction note
Fibre/filler batching systemControls board compositionApproved formula
Wet-forming/press lineForms tile matDensity/thickness control
Dryer and coaterCures and finishes tilesMoisture/surface target
Edge/cutting/QC lineReleases grid-compatible tilesDimensional/fire checks

Raw materials, utilities and factory requirements

Indicative low-entry investment and implementation plan

These planning ranges prioritize economical machinery, local labor and local civil works. Final pricing follows confirmed capacity, product specification, delivery terms and site conditions.

ScopeIndicative rangeEntry-plan note
Forming, pressing and dryingUS$300k–900kMedium industrial wet process
Coating, edge finish and QCUS$120k–400kTile performance scope
Indicative totalUS$500k–1.4mFormula development/building excluded

Detailed proposal and next step

The proposal contains the complete line flow, machinery scope, raw-material and utility requirements, implementation stages and indicative entry planning. Final configuration follows confirmed products, capacity, site and budget.