Industrial sourcing and implementation for Afghanistan

Decorative 3D Gypsum Wall-Panel Line

A compact casting line making repeatable 3D gypsum wall panels from measured gypsum slurry, fibre reinforcement and designed moulds, followed by setting, demoulding, controlled drying, edge finishing and packing.

View detailed proposal PDF
Decorative 3D Gypsum Wall-Panel Line equipment and production reference

Production line and factory setup overview

A compact casting line making repeatable 3D gypsum wall panels from measured gypsum slurry, fibre reinforcement and designed moulds, followed by setting, demoulding, controlled drying, edge finishing and packing.

Recommended lowest-entry line configuration Start with 6-10 contractor-approved 3D designs and one panel size; prove flatness, reinforcement and dry handling before adding patterns.

local gypsumcore input
reusable mouldsprocess basis
dry finishrelease gate
small teamentry operation

Production process and implementation sequence

  1. Material dosing and slurry mixing
  2. Mould release and reinforcement placement
  3. 3D casting and vibration
  4. Setting and careful demoulding
  5. Controlled drying and edge finishing
  6. Visual inspection, packing and dispatch

Products, capacity and market fit

  • Use local gypsum only after test casting.
  • Mould quality and controlled drying govern saleable finish.
  • Launch with a focused design range and contractor samples.
  • 3D gypsum wall panels - Panel size, relief depth, flatness, reinforcement, edge accuracy and dryness - Interior decorators, retailers, offices, hotels and housing projects

Core production machinery and line specifications

Machine / stageFunction / valueProduction note
Mixer and dosing stationControls workable gypsum slurryTested recipe
3D silicone/fibreglass mouldsForms repeatable relief pattern6-10 starter designs
Casting tables and drying racksProtects panel flatnessPanel-size matched
Trimming and packing toolsReleases installable panelsEdge/sample approval

Raw materials, utilities and factory requirements

Indicative low-entry investment and implementation plan

These planning ranges prioritize economical machinery, local labor and local civil works. Final pricing follows confirmed capacity, product specification, delivery terms and site conditions.

ScopeIndicative rangeEntry-plan note
Mixing, casting and starter mouldsUS$8k-22k6-10 pattern range
Drying, trimming and packingUS$5k-15kManual finish scope
Indicative low-entry totalUS$18k-50kLand and working capital excluded

Detailed proposal and next step

The proposal contains the complete line flow, machinery scope, raw-material and utility requirements, implementation stages and indicative entry planning. Final configuration follows confirmed products, capacity, site and budget.

Related industrial references