Production line and factory setup overview
Fabricates aluminium-and-glass office partitions through profile cutting/machining, frame assembly, glazing, doors and hardware fitting, seals, dry fit, pack sequencing and installation checks.
Recommended lowest-entry line configuration Launch with a defined profile system, glass thicknesses, standard doors and tested gasket/hardware combinations. Confirm room dimensions, acoustic/fire requirements where applicable, glass safety, anchoring and installation tolerances before pricing projects.
Production process and implementation sequence
- Profile/glass order review
- Profile cutting and machining
- Frame assembly
- Glass preparation and glazing
- Door/hardware/seal fitting
- Dry layout and dimensional check
- Protected pack sequencing
- Site installation and hand-over
Products, capacity and market fit
- Approve a physical sample and applicable standard.
- Launch with a defined product range and documented tool settings.
- Keep material and quality records for each batch.
- Aluminium and glass office partitions - Profile system, glass type/thickness, door and hardware, gasket/seal, acoustic requirement, wall/ceiling anchoring, module size and installation tolerance - Offices, clinics, schools, retail, co-working, hotels and commercial fit-out contractors
Core production machinery and line specifications
| Machine / stage | Function / value | Production note |
|---|---|---|
| Profile cutting/machining station | Prepares aluminium frames | Cut/machining tolerance |
| Assembly tables | Builds square modules | Frame/squareness control |
| Glass handling/glazing station | Fits panels safely | Glass/gasket seating |
| Door/hardware bench | Sets operating components | Door alignment/function |
| Installation/QC kit | Releases project packs | Anchor/layout checklist |
Raw materials, utilities and factory requirements
- Aluminium profiles, tempered/laminated glass as specified, gaskets, seals, hinges, locks, handles, fasteners, anchors, protective film and packaging
- Stable electricity, covered raw-material storage and protected finished-goods handling
- Guarded equipment, documented maintenance, essential spares and product-specific safety controls
Indicative low-entry investment and implementation plan
These planning ranges prioritize economical machinery, local labor and local civil works. Final pricing follows confirmed capacity, product specification, delivery terms and site conditions.
| Scope | Indicative range | Entry-plan note |
|---|---|---|
| Profile cutting, machining and assembly | US$12k-45k | Small fabrication workshop |
| Glass handling, glazing and door hardware | US$10k-40k | Standard partition system |
| Installation tools, freight and samples | US$6k-25k | Project mock-up required |
| Indicative entry total | US$28k-110k | Workshop, profiles and glass stock excluded |
Detailed proposal and next step
The proposal contains the complete line flow, machinery scope, raw-material and utility requirements, implementation stages and indicative entry planning. Final configuration follows confirmed products, capacity, site and budget.
